Home   Products & Services   Our References   Contact Us  
  dustless sanding        

Installation of Hardwood Floors

1. Glue down method

2. Floating method

               

Glue down method

This method is suitable for most of Engineered Hardwood Floors and Solid Hardwood Floors. We use flexible one component, solvent free moisture curing polyurethane timber flooring adhesive. For traditional solid hardwood floors, after 1-day of installation, the floors are proper to sand by machine.

Please see datasheet of the adhesive here http://www.tropical-decor.com/images/Bostik/ultraset/Bostik Ultraset.pdf

                       

Floating method

This method is suitable for Engineered Hardwood Floors, Pre-finished Hardwood Floors and Laminate Floors. As the wood planks are not adhere to the subfloor, it cannot be sanded by machine.

First, lay EVA sheet (2 mm. thickness) on the smooth, level subfloor with tape.

Then, lay wood plank by put latex glue at the wood plank tongue & groove.

 
 
bostik wood installation
  Bellefloor        
                 
                       

© 2002-2018 Tropical Decor Co. Ltd., all rights reserved.